中文English

Project Cargo Ocean

Project logistics via RoRo, breakbulk, multimodal.

Get Formal Quote & Plan

Project cargo covers construction machinery, complete production lines and oversized equipment that does not fit standard boxes, moved by RoRo, breakbulk, flat-rack and open-top.

One team handles site survey, lashing and reinforcement, US clearance and inland delivery, with our own broker and local agents.

What suits project cargo

Construction machinery

Excavators, loaders and similar equipment.

Complete production lines

Dismantled, numbered and shipped in batches.

Out-of-gauge equipment

Flat-rack, open-top or breakbulk for oversized units.

Exhibition and project freight

Consolidated shipments tied to a project schedule.

Oversized truck rate reference (October 2026)

LaneUS WestUS CentralUS East
Matson oversized truck (150KG+)$4.24–3.43$4.12–3.58$4.53–3.83
ZIM oversized truck (150KG+)$3.89–3.08$3.77–3.23$4.18–3.48

USD per KG for oversized truck delivery above 150KG, priced by US ZIP zone plus a USD 76 handling fee per shipment. Project cargo is quoted case by case on volume, weight, route and handling — a site survey precedes the formal plan and quote.

Check live US ocean rates

How project cargo works

1. Site survey

Confirm dimensions, weight, centre of gravity and loading conditions.

2. Plan the move

Choose equipment type, vessel, lashing plan and route.

3. Reinforce

Crate, frame or palletize with photo records.

4. Load and ship

RoRo, breakbulk or flat-rack with loading supervision.

5. US customs

Own broker, DDP duty paid.

6. Inland delivery

Crane, forklift and placement at site.

FAQ

Flat-rack or open-top?

Open-top for over-height cargo, flat-rack for over-width or over-length, decided by the actual dimensions.

Who handles oversize permits?

US inland oversize moves need permits; we arrange them and plan the route.

Can I insure project cargo?

Yes, and we recommend full-value cover for project moves.

How is unloading handled?

Crane, forklift and site placement can be arranged — confirm site and road access in advance.

How long does project cargo take?

Typically 30-45 days door to door depending on route and handling.

Related services

Oversized ocean · Oversized solutions · Get a project quote

Need Project Cargo Ocean quote?

Tell us cargo & destination; PDF quote within 2 hours.

Get Formal Quote & Plan

Related Services

Get Quote